Horizontal well segmented temporary blockage fracturing method
A horizontal well and fracturing technology, which is applied in earthwork drilling, wellbore/well components, production fluids, etc. It can solve problems such as complex construction, residual wellbore, formation pollution, etc.
- Summary
 - Abstract
 - Description
 - Claims
 - Application Information
 
 AI Technical Summary 
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] ZDY-6 temporary plugging agent
[0015] ZDY-6 temporary plugging agent is a granular temporary plugging agent with a particle size of 2-10mm, which can meet different perforation apertures, and a temporary plugging agent with an appropriate particle size can be selected according to the perforation size of each well. In the fracturing construction project, when the fracturing fracture reaches a sufficient length, the ZDY-6 temporary plugging agent is pumped into the sand mixing vehicle and mixed with the fracturing fluid. : When the length of the temporary plugging agent plugging section reaches 0.2 ~ 1m, its pressure bearing capacity is 20 ~ 100MPa).
[0016] A method for staged temporary plugging and fracturing of a horizontal well, comprising the following steps:
[0017] (1) Drill the horizontal well, perform well logging and complete the relevant casing;
[0018] (2) Perform one-time perforation on the analyzed oil-bearing layer through the logging curve, without...
PUM
 Login to View More Abstract
Description
Claims
Application Information
 Login to View More - R&D
 - Intellectual Property
 - Life Sciences
 - Materials
 - Tech Scout
 
- Unparalleled Data Quality
 - Higher Quality Content
 - 60% Fewer Hallucinations
 
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



