A spin-digging drilling rig is used for a sand stratum, a clay stratum, a broken 
pebble stone stratum, a hard rock stratum and a 
sludge stratum, and a special stratum spin-digging 
pile hole-forming construction method is characterized by including the steps of a, conducting positioning and paying off; b, burying a protective cylinder; c, preparing 
sludge; d, putting the spin-digging drilling rig in place; e, drilling holes; f, checking and accepting finished holes and conducting the conversional cast-in-place 
pile construction procedure of subsequently putting down a reinforcement cage for pouring concrete. The method has the advantages that construction steps are reasonable in design and easy to operate, the spin-digging drilling rig can effectively 
drill in the five special stratums including the sand stratum, the clay stratum, the broken 
pebble stone stratum, the hard rock stratum and the 
sludge stratum, construction efficiency is improved, the special stratums can be prevented from special 
processing, no special devices need to be arranged, project cost is saved, hole collapse and other quality problems are effectively avoided, and the quality of the finished holes is ensured.