The invention relates to a 
heavy load salvage wave compensation 
system of a super large floating crane, which comprises a 
mechanical system, a hydraulic 
system, a monitor 
system, control of a hydraulic oil cylinder, control of an accumulator and the like, wherein the 
mechanical system consists of a lifting drum, a plurality of sets of 
pulley, a steel 
wire rope and a large 
tonnage lifting hook, the hydraulic system consists of an oil cylinder, the accumulator, the hydraulic oil cylinder and a hydraulic valve, and the monitor system consists of a floating crane body displacement monitor, a floating crane ship body displacement monitor and a floating crane lifting 
heavy weight displacement monitor. The invention solves the problems that when the super large floating crane carries out 
heavy load salvage, and at the moment that a 
heavy weight is lifted out of water, because the 
heavy weight has large volume, 
seawater forms an 
eddy current to enable a floating crane ship body to be inclined and swing, and a 
lifting weight also swings along with the floating crane ship body and can not be controlled, solves the problems that when a large structure is lifted on the sea, 
waves influence the floating crane ship body to lead to difficult butting of marine platforms to ensure goods to be safely fall on a ship 
deck or safe offshore platform installation and allows that the ship has certain inclination to be suitable for tough working conditions of marine operation.