The invention discloses a thick 
coal seam wide-roadway tunneling and 
gangue paste body filling roadway forming method and belongs to the technical field of 
mining industry. The method comprises the steps that firstly, according to the 
coal seam geological condition, the widths of a filled belt and a newly-tunneled roadway are designed; secondly, according to the mine existing tunneling technological condition, the filling length, namely the circular filling step 
pitch, of each time is determined; when the newly-tunneled roadway is tunneled, through high strength anchor rods abd anchor net cables, top plates, bottom plates and roadway inner 
coal walls are supported; then, after the newly-tunneled roadway is tunneled by the circular filling step 
pitch, roadway-expanding tunneling begins to be conducted along the roadway outer coal wall; during roadway-expanding tunneling, hydraulic supporting columns are adopted to be matched with 
metal hinging top beams for temporary support of the filled belt and the junction of the filled belt and the newly-tunneled roadway; finally, after roadway-expanding tunneling is completed, the temporary support is removed, the filled belt is filled; and then the steps are sequentially and alternately implemented. According to the thick coal seam wide-roadway tunneling and 
gangue paste body filling roadway forming method, the coal loss caused by unexploited coal pillars can be effectively reduced, the influence of mine pressure in roadway tunneling is reduced, and the 
gangue treatment and roadway tunneling costs are reduced.