The invention relates to a construction method of a V-level surrounding 
rock tunnel, comprising the following steps: (1) making a 
drill guiding I-beam steel lagging jack, i.e. mounting an I-beam steel lagging jack, a groove steel trimming beam, a lock pin anchor rod, a guiding steel 
pipe, a longitudinal connection steel rib and face injecting concrete in sequence; and (2) construction and support in the tunnel, i.e. drilling 
pipe shelter steel 
pipe holes, mounting pipe shelter steel pipes, filling 
slurry inwards. The earthwork construction of a 
pilot tunnel comprises earthwork construction, primary support, injecting concrete on a 
pilot tunnel wall, suspending 
steel bar nets, 
casting concrete basis, mounting I-beam steel lagging jack, groove steel trimming beam, steel pads, I-shaped steel inclined strut and lock pin anchor rods, 
welding longitudinal connection 
steel bar, injecting concrete on the face and removing core soils; mounting a first-level step temporary inverted arch comprises: constructing lower-level earthwork, performing primary support in the pivot tunnel, mounting the second-level step temporary inverted arch, constructing the following level of earthwork, performing primary support, 
casting and filling inverted arch, and 
casting lining concrete at a time inside the pivot tunnel. The invention has the 
advantage of rapid penetration speed and safe construction.