The present invention relates to a construction method of a high-strength 
prestressed concrete pipe pile. The method can be effectively used for the requirement of the construction of the high-rise building high strength 
prestressed concrete pipe pile and settles the problems of safety and stability in the high-rise building. The 
settling technical scheme is that the piling 
machine is arranged after measuring and wire arranging. When the precast 
pile is checked, the precast pile is hoisted with the piling 
machine. When the pile is stable, the precast pile is executed with pressing. After pressing, the pile splicing and pile feeding are executed. When the test pile is checked to be qualified, the piling 
machine can be transferred for the next cycle operation. The method of the invention is advanced and scientific and has the advantages of fast construction speed, easy operation, good quality, strong 
strain resistance, stability, safety, no environmental 
pollution and tremendous economic and social benefit.