The invention provides a complete-set steel casing construction method of a concrete cast-in-place bored 
pile passing through an underground gallery. The method comprises the steps that a locating steel casing is buried; a rotary-digging drilling bucket or an 
auger bit is utilized to 
drill a hole in a soil body, and a protection steel casing follows up synchronously in the drilling process; when agallery top plate of the underground gallery is reached, a cylindrical 
coring bit is used instead for drilling on the gallery top plate, and the drilling tool is lifted up after penetration to take out a concrete core; the cylindrical 
coring bit continues to be utilized to 
drill through a gallery bottom plate of the underground gallery, and the drilling tool is lifted up to take out the concretecore; a partition steel casing is placed down; the rotary-digging drilling bucket is used instead to continue to 
drill into undisturbed soil and 
bed rock to a designed end hole position; a flat-bottomed rotary-digging drilling bucket is utilized to remove 
sediment at a hole bottom to ensure that the thickness of the 
sediment is controlled within a standard allowed range; a reinforcement cage is placed down; 
pile foundation concrete pouring is performed; the protection steel casing and the locating steel casing are taken out, and concrete is poured as supplement to finishing elevation; and construction of the concrete cast-in-place bored 
pile passing through the underground gallery is realized through the steps. Through the method, a 
working environment is obviously improved, and the methodis more 
environmentally friendly.