The invention relates to an offshore drilled absorbing 
pile and the construction method thereof. When a drilling bit (11) breaks the ground and is drilled, an 
immersed tube is drilled into a 
high pressure water pump (18) on the main 
machine of a drilling 
machine, and supplies 
high pressure water for the lower part of the drilling bit through the central tube of a drilling rod to form 
high pressure slurry, and the 
slurry is discharged out of the drilled absorbing 
pile through a one-way valve (7) installed on a baffle plate and a 
slurry discharging tube (9) connected with the one-way valve. The drilling bit is drilled and breaks the ground from the upper part of the sealed bin of the drilled absorbing 
pile to the bottom of the drilled absorbing pile to clean all the soil plugs in the sealed bin out of the drilled absorbing pile, the drilling bit is stopped, and simultaneously the 
high pressure water pump (18) stops supplying water. A submersible 
sewage pump on the drilling 
machine is started up, the one-way valve (7) on the cone shaped baffle plate is closed to ensure that a sealed space is formed at the lower part, the sea water is discharged from the sealed space through the submersible 
sewage pump (19) to form negative pressure, the drilled absorbing pile is immersed into the sea 
bed under the sea 
water pressure, the drilling bit is supported on the mud surface and keeps still when the drilled absorbing pile is immersed, the cone shaped baffle plate of the drilled absorbing pile is lowered to the drilling bit position along the drilling rod (10) to stop the water discharging of the submersible 
sewage pump, and thus the primary drilling of the drilled absorbing pile is completed. The former operations are repeated to ensure the drilled absorbing pile to enter into the sea 
bed in a step-by-step 
immersed tube drilling way, in order to complete the driving-in construction of the drilled absorbing pile.